IAC Assessment: OR0668
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0668
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2016
Principal Product Rebar and Wire Rod
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $100,000,000-$500,000,000
# of Employees 418
Plant Area (Sq.Ft.) 500,000
Annual Production 600,000 Tons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,441,491 359,713,453 kWh $0.04
Electricity Demand $1,223,455 116,409 kW-months/year $10.51
Natural Gas $2,004,550 864,224 MMBtu $2.32
TOTAL ENERGY COSTS $17,669,496
RECOMMENDED SAVINGS* $309,080 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,056
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$64,602
Cost:
$27,375
$64,602 1,138,823 - - - - $64,602
1,138,823
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,966
Cost:
$1,900
$3,966 93,696 - - - - $3,966
93,696
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.5123 REDUCE FLUID FLOW RATES Savings:
$9,090
Cost:
$13,345
$9,090 214,741 - - - - $9,090
214,741
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$20,693
Cost:
$21,375
$12,997 307,043 $7,696 732 - - $12,997
307,043
kWh
$7,696
732
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$18,529
Cost:
$42,750
$12,790 302,154 $5,739 546 - - $12,790
302,154
kWh
$5,739
546
kW-months/year
-
-
MMBtu
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$20,233
Cost:
$54,456
- - - - $20,233 8,721 -
-
kWh
-
-
kW-months/year
$20,233
8,721
MMBtu
07: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$131,042
Cost:
$638,642
- - - - $131,042 56,484 -
-
kWh
-
-
kW-months/year
$131,042
56,484
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$40,925
Cost:
$70,000
- - - - $40,925 17,640 -
-
kWh
-
-
kW-months/year
$40,925
17,640
MMBtu
TOTAL RECOMMENDED Savings:
$309,080
Cost:
$869,843
$103,445 2,056,457 $13,435 1,278 $192,200 82,845 $103,445
2,056,457
kWh
$13,435
1,278
kW-months/year
$192,200
82,845
MMBtu
TOTAL IMPLEMENTED Savings:
$13,056
Cost:
$15,245
$13,056 308,437 - - - - $13,056
308,437
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas