Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2016 |
Principal Product | Rebar and Wire Rod |
NAICS | 331221 - Rolled Steel Shape Manufacturing |
SIC | 3312 - Blast Furnaces And Steel Mills |
Sales | $100,000,000-$500,000,000 |
# of Employees | 418 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 600,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $14,441,491 | 359,713,453 | kWh | $0.04 |
Electricity Demand | $1,223,455 | 116,409 | kW-months/year | $10.51 |
Natural Gas | $2,004,550 | 864,224 | MMBtu | $2.32 |
TOTAL ENERGY COSTS | $17,669,496 | |||
RECOMMENDED SAVINGS* | $309,080 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,056 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $64,602 Cost: $27,375 |
$64,602 | 1,138,823 | - | - | - | - |
$64,602 1,138,823 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $3,966 Cost: $1,900 |
$3,966 | 93,696 | - | - | - | - |
$3,966 93,696 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.5123 REDUCE FLUID FLOW RATES |
Savings: $9,090 Cost: $13,345 |
$9,090 | 214,741 | - | - | - | - |
$9,090 214,741 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $20,693 Cost: $21,375 |
$12,997 | 307,043 | $7,696 | 732 | - | - |
$12,997 307,043 kWh |
$7,696 732 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $18,529 Cost: $42,750 |
$12,790 | 302,154 | $5,739 | 546 | - | - |
$12,790 302,154 kWh |
$5,739 546 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $20,233 Cost: $54,456 |
- | - | - | - | $20,233 | 8,721 |
- - kWh |
- - kW-months/year |
$20,233 8,721 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $131,042 Cost: $638,642 |
- | - | - | - | $131,042 | 56,484 |
- - kWh |
- - kW-months/year |
$131,042 56,484 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $40,925 Cost: $70,000 |
- | - | - | - | $40,925 | 17,640 |
- - kWh |
- - kW-months/year |
$40,925 17,640 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $309,080 Cost: $869,843 |
$103,445 | 2,056,457 | $13,435 | 1,278 | $192,200 | 82,845 | $103,445 2,056,457 kWh |
$13,435 1,278 kW-months/year |
$192,200 82,845 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,056 Cost: $15,245 |
$13,056 | 308,437 | - | - | - | - | $13,056 308,437 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |