IAC logo
IAC Assessment: OR0673
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0673
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2016
Principal Product Plastic Containers
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 96,000
Annual Production 40,000,000 Units
Production Hrs. Annual 6,240
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $192,640 4,676,630 kWh $0.04
Electricity Demand $94,920 12,656 kW-months/year $7.50
Electricity Fees $1,200 - $ -
Natural Gas $839 27 MMBtu $31.07
TOTAL ENERGY COSTS $289,599
RECOMMENDED SAVINGS* $268,278 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,581
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$157,793
Cost:
$301,613
$1,825 44,306 $1,370 183 - - - - $154,598 - $1,825
44,306
kWh
$1,370
183
kW-months/year
-
-
$
-
-
$
$154,598
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$102,571
Cost:
$10,390
$20,162 489,494 - - - - - - $82,409 - $20,162
489,494
kWh
-
-
kW-months/year
-
-
$
-
-
$
$82,409
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,333
Cost:
$229
$4,333 105,185 - - - - - - - - $4,333
105,185
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,117
Cost:
$5,344
$1,690 41,034 $592 79 $482 - $(-647) - - - $1,690
41,034
kWh
$592
79
kW-months/year
$482
-
$
$(-647)
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,464
Cost:
-
$1,082 26,279 $382 51 - - - - - - $1,082
26,279
kWh
$382
51
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$268,278
Cost:
$317,576
$29,092 706,298 $2,344 313 $482 - $(-647) - $237,007 - $29,092
706,298
kWh
$2,344
313
kW-months/year
$482
-
$
$(-647)
-
$
$237,007
-
$
TOTAL IMPLEMENTED Savings:
$3,581
Cost:
$5,344
$2,772 67,313 $974 130 $482 - $(-647) - - - $2,772
67,313
kWh
$974
130
kW-months/year
$482
-
$
$(-647)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Primary Product