IAC Assessment: OR0677
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0677
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2016
Principal Product Finished Metals
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 81
Plant Area (Sq.Ft.) 35,000
Annual Production 15,000,000 Units
Production Hrs. Annual 4,680
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,143 1,453,360 kWh $0.06
Electricity Demand $23,121 4,070 kW-months/year $5.68
Electricity Fees $9,804 - $ -
Natural Gas $69,757 12,368 MMBtu $5.64
TOTAL ENERGY COSTS $192,825
RECOMMENDED SAVINGS* $27,212 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,436
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,372
Cost:
$5,408
- - - - $7,372 1,307 - - - - -
-
kWh
-
-
kW-months/year
$7,372
1,307
MMBtu
-
-
$
-
-
$
02: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$1,822
Cost:
$300
- - - - $5,844 1,036 $(-4,022) - - - -
-
kWh
-
-
kW-months/year
$5,844
1,036
MMBtu
$(-4,022)
-
$
-
-
$
03: 2.1224 REPLACE BOILER Savings:
$4,164
Cost:
$17,322
- - - - $4,164 738 - - - - -
-
kWh
-
-
kW-months/year
$4,164
738
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,583
Cost:
$22,256
$9,120 141,622 $1,531 262 - - $507 - $(-575) - $9,120
141,622
kWh
$1,531
262
kW-months/year
-
-
MMBtu
$507
-
$
$(-575)
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,064
Cost:
$658
- - - - $2,064 366 - - - - -
-
kWh
-
-
kW-months/year
$2,064
366
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,207
Cost:
$944
$863 13,373 $344 55 - - - - - - $863
13,373
kWh
$344
55
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$27,212
Cost:
$46,888
$9,983 154,995 $1,875 317 $19,444 3,447 $(-3,515) - $(-575) - $9,983
154,995
kWh
$1,875
317
kW-months/year
$19,444
3,447
MMBtu
$(-3,515)
-
$
$(-575)
-
$
TOTAL IMPLEMENTED Savings:
$9,436
Cost:
$6,066
- - - - $9,436 1,673 - - - - -
-
kWh
-
-
kW-months/year
$9,436
1,673
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost