IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2016
Principal Product Particle Board
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 827,640
Annual Production 5,000,000 Units
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,634,111 70,044,000 kWh $0.07
Natural Gas $1,308,716 426,292 MMBtu $3.07
TOTAL ENERGY COSTS $5,942,827
RECOMMENDED SAVINGS* $202,798 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $143,883
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$74,285
Cost:
$6,200
$74,285 1,122,803 - - - - - - $74,285
1,122,803
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$20,472
Cost:
-
$20,472 309,426 - - - - - - $20,472
309,426
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,003
Cost:
$10,369
$10,003 151,191 - - - - - - $10,003
151,191
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$31,513
Cost:
$47,575
- - $31,513 10,265 - - - - -
-
kWh
$31,513
10,265
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,613
Cost:
$47,385
$18,394 278,023 - - $(-1,087) - $306 - $18,394
278,023
kWh
-
-
MMBtu
$(-1,087)
-
$
$306
-
$
06: 2.1224 REPLACE BOILER Savings:
$48,912
Cost:
$250,000
- - $48,912 15,932 - - - - -
-
kWh
$48,912
15,932
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$202,798
Cost:
$361,529
$123,154 1,861,443 $80,425 26,197 $(-1,087) - $306 - $123,154
1,861,443
kWh
$80,425
26,197
MMBtu
$(-1,087)
-
$
$306
-
$
TOTAL IMPLEMENTED Savings:
$143,883
Cost:
$101,160
$113,151 1,710,252 $31,513 10,265 $(-1,087) - $306 - $113,151
1,710,252
kWh
$31,513
10,265
MMBtu
$(-1,087)
-
$
$306
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost