IAC logo
IAC Assessment: OR0680
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0680
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2017
Principal Product Asphalt Products
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 6
Plant Area (Sq.Ft.) 80,000
Annual Production 11,000 Tons
Production Hrs. Annual 1,837
Location (State) AK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,134 429,400 kWh $0.10
Electricity Demand $30,823 1,602 kW-months/year $19.24
Electricity Fees $660 - $ -
Natural Gas $46,102 4,925 MMBtu $9.36
TOTAL ENERGY COSTS $118,719
RECOMMENDED SAVINGS* $96,765 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,199
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$45,000
Cost:
$66,392
- - - - - - $45,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$45,000
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$42,852
Cost:
$150,000
$31,791 331,848 $23,956 1,245 $(-12,895) (-1,618) - - $31,791
331,848
kWh
$23,956
1,245
kW-months/year
$(-12,895)
(-1,618)
MMBtu
-
-
$
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$2,467
Cost:
$1,000
- - - - $2,467 310 - - -
-
kWh
-
-
kW-months/year
$2,467
310
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,732
Cost:
$3,529
- - $1,732 90 - - - - -
-
kWh
$1,732
90
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,714
Cost:
$13,620
- - - - $4,714 591 - - -
-
kWh
-
-
kW-months/year
$4,714
591
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$96,765
Cost:
$234,541
$31,791 331,848 $25,688 1,335 $(-5,714) (-717) $45,000 - $31,791
331,848
kWh
$25,688
1,335
kW-months/year
$(-5,714)
(-717)
MMBtu
$45,000
-
$
TOTAL IMPLEMENTED Savings:
$49,199
Cost:
$70,921
- - $1,732 90 $2,467 310 $45,000 - -
-
kWh
$1,732
90
kW-months/year
$2,467
310
MMBtu
$45,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes