IAC Assessment: OR0698
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0698
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2018
Principal Product Bus Maintenance
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $5,000,000-$10,000,000
# of Employees 320
Plant Area (Sq.Ft.) 94,600
Annual Production 107 Pieces
Production Hrs. Annual 2,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,852 1,814,600 kWh $0.04
Electricity Demand $19,387 3,378 kW-months/year $5.74
Electricity Fees $2,131 - $ -
Natural Gas $53,575 6,504 MMBtu $8.24
TOTAL ENERGY COSTS $155,945
RECOMMENDED SAVINGS* $66,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,983
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$32,214
Cost:
$597
- - - - - - $32,214 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$32,214
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$18,374
Cost:
$9,440
- - $18,374 2,880 - - - - -
-
kWh
$18,374
2,880
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$12,461
Cost:
$22,850
$15,498 358,176 - - $(-3,037) (-370) - - $15,498
358,176
kWh
-
-
kW-months/year
$(-3,037)
(-370)
MMBtu
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,148
Cost:
$325
$1,073 24,790 $2,075 325 - - - - $1,073
24,790
kWh
$2,075
325
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$66,197
Cost:
$33,212
$16,571 382,966 $20,449 3,205 $(-3,037) (-370) $32,214 - $16,571
382,966
kWh
$20,449
3,205
kW-months/year
$(-3,037)
(-370)
MMBtu
$32,214
-
$
TOTAL IMPLEMENTED Savings:
$33,983
Cost:
$32,615
$16,571 382,966 $20,449 3,205 $(-3,037) (-370) - - $16,571
382,966
kWh
$20,449
3,205
kW-months/year
$(-3,037)
(-370)
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes