IAC logo
IAC Assessment: OR0700
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0700
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2018
Principal Product Excavator Attachments
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $5,000,000-$10,000,000
# of Employees 41
Plant Area (Sq.Ft.) 345,500
Annual Production 114 Units
Production Hrs. Annual 2,250
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,557 764,027 kWh $0.09
Natural Gas $18,559 2,240 MMBtu $8.29
LPG $5,841 172 MMBtu $33.96
Fuel Oil #1 $9,638 225 MMBtu $42.84
TOTAL ENERGY COSTS $136,168
RECOMMENDED SAVINGS* $12,664 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes
$ kWh $ MMBtu $ gal $ $ $ $
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$7,430
Cost:
$1,495
- - - - $7,430 179 - - - - -
-
kWh
-
-
MMBtu
$7,430
179
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,059
Cost:
$6,826
$3,189 39,123 - - - - $155 - $(-285) - $3,189
39,123
kWh
-
-
MMBtu
-
-
gal
$155
-
$
$(-285)
-
$
03: 2.5115 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE Savings:
$2,175
Cost:
$5,389
- - $2,175 265 - - - - - - -
-
kWh
$2,175
265
MMBtu
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$12,664
Cost:
$13,710
$3,189 39,123 $2,175 265 $7,430 179 $155 - $(-285) - $3,189
39,123
kWh
$2,175
265
MMBtu
$7,430
179
gal
$155
-
$
$(-285)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $ $ $
Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes