Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2018 |
Principal Product | Excavator Attachments |
NAICS | 333120 - Construction Machinery Manufacturing |
SIC | 3531 - Construction Machinery |
Sales | $5,000,000-$10,000,000 |
# of Employees | 41 |
Plant Area (Sq.Ft.) | 345,500 |
Annual Production | 114 Units |
Production Hrs. Annual | 2,250 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $67,557 | 764,027 | kWh | $0.09 |
Natural Gas | $18,559 | 2,240 | MMBtu | $8.29 |
LPG | $5,841 | 172 | MMBtu | $33.96 |
Fuel Oil #1 | $9,638 | 225 | MMBtu | $42.84 |
TOTAL ENERGY COSTS | $136,168 | |||
RECOMMENDED SAVINGS* | $12,664 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $7,430 Cost: $1,495 |
- | - | - | - | $7,430 | 179 | - | - | - | - |
- - kWh |
- - MMBtu |
$7,430 179 gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,059 Cost: $6,826 |
$3,189 | 39,123 | - | - | - | - | $155 | - | $(-285) | - |
$3,189 39,123 kWh |
- - MMBtu |
- - gal |
$155 - $ |
$(-285) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.5115 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE |
Savings: $2,175 Cost: $5,389 |
- | - | $2,175 | 265 | - | - | - | - | - | - |
- - kWh |
$2,175 265 MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,664 Cost: $13,710 |
$3,189 | 39,123 | $2,175 | 265 | $7,430 | 179 | $155 | - | $(-285) | - | $3,189 39,123 kWh |
$2,175 265 MMBtu |
$7,430 179 gal |
$155 - $ |
$(-285) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Administrative Changes | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Personnel Changes | Administrative Changes |