IAC logo
IAC Assessment: OR0702
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0702
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2018
Principal Product Aerospace Plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 108,000
Annual Production 114,996 Units
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,907 2,794,020 kWh $0.06
Electricity Demand $82,574 8,739 kW-months/year $9.45
Electricity Fees $17,102 - $ -
Natural Gas $77,979 9,441 MMBtu $8.26
TOTAL ENERGY COSTS $340,562
RECOMMENDED SAVINGS* $34,362 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING Savings:
$20,800
Cost:
$7,140
- - - - $20,800 - -
-
kWh
-
-
MMBtu
$20,800
-
$
02: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$5,088
Cost:
$660
$5,088 86,524 - - - - $5,088
86,524
kWh
-
-
MMBtu
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,409
Cost:
$1,005
$3,409 49,773 - - - - $3,409
49,773
kWh
-
-
MMBtu
-
-
$
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$5,065
Cost:
$5,807
- - $5,065 795 - - -
-
kWh
$5,065
795
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$34,362
Cost:
$14,612
$8,497 136,297 $5,065 795 $20,800 - $8,497
136,297
kWh
$5,065
795
MMBtu
$20,800
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes