IAC logo
IAC Assessment: OR0713
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0713
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2018
Principal Product Aggregate, Ready-Mix Concrete, Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 680,000
Annual Production 412,707 Units
Production Hrs. Annual 3,120
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,070 769,000 kWh $0.06
Electricity Demand $20,288 3,204 kW-months/year $6.33
Electricity Fees $6,000 - $ -
Natural Gas $403,481 72,616 MMBtu $5.56
TOTAL ENERGY COSTS $478,839
RECOMMENDED SAVINGS* $249,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,608
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Administrative Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$219,819
Cost:
$375,000
- - - - - - $(-18,181) (-5,250) $238,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-18,181)
(-5,250)
MMBtu
$238,000
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,959
Cost:
$10,959
$9,203 144,221 $756 119 - - - - - - $9,203
144,221
kWh
$756
119
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,594
Cost:
$4,336
$7,794 122,147 $800 126 - - - - - - $7,794
122,147
kWh
$800
126
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,018
Cost:
$26,371
$5,828 91,337 $1,190 188 - - - - - - $5,828
91,337
kWh
$1,190
188
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,108
Cost:
$5,028
$3,773 59,130 $909 144 $(-1,574) (-288) - - - - $3,773
59,130
kWh
$909
144
kW-months/year
$(-1,574)
(-288)
MMBtu
-
-
MMBtu
-
-
$
06: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$929
Cost:
-
- - - - $1,929 353 - - $(-1,000) - -
-
kWh
-
-
kW-months/year
$1,929
353
MMBtu
-
-
MMBtu
$(-1,000)
-
$
TOTAL RECOMMENDED Savings:
$249,427
Cost:
$421,694
$26,598 416,835 $3,655 577 $355 65 $(-18,181) (-5,250) $237,000 - $26,598
416,835
kWh
$3,655
577
kW-months/year
$355
65
MMBtu
$(-18,181)
(-5,250)
MMBtu
$237,000
-
$
TOTAL IMPLEMENTED Savings:
$29,608
Cost:
$46,694
$26,598 416,835 $3,655 577 $355 65 - - $(-1,000) - $26,598
416,835
kWh
$3,655
577
kW-months/year
$355
65
MMBtu
-
-
MMBtu
$(-1,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Administrative Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Administrative Changes