Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2018 |
Principal Product | Aggregate, Ready-Mix Concrete, Asphalt |
NAICS | 324121 - Asphalt Paving Mixture and Block Manufacturing |
SIC | 3273 - Ready-mixed Concrete |
Sales | $10,000,000-$50,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 680,000 |
Annual Production | 412,707 Units |
Production Hrs. Annual | 3,120 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $49,070 | 769,000 | kWh | $0.06 |
Electricity Demand | $20,288 | 3,204 | kW-months/year | $6.33 |
Electricity Fees | $6,000 | - | $ | - |
Natural Gas | $403,481 | 72,616 | MMBtu | $5.56 |
TOTAL ENERGY COSTS | $478,839 | |||
RECOMMENDED SAVINGS* | $249,427 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $29,608 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #1 | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #1 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING |
Savings: $219,819 Cost: $375,000 |
- | - | - | - | - | - | $(-18,181) | (-5,250) | $238,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$(-18,181) (-5,250) MMBtu |
$238,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,959 Cost: $10,959 |
$9,203 | 144,221 | $756 | 119 | - | - | - | - | - | - |
$9,203 144,221 kWh |
$756 119 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,594 Cost: $4,336 |
$7,794 | 122,147 | $800 | 126 | - | - | - | - | - | - |
$7,794 122,147 kWh |
$800 126 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $7,018 Cost: $26,371 |
$5,828 | 91,337 | $1,190 | 188 | - | - | - | - | - | - |
$5,828 91,337 kWh |
$1,190 188 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,108 Cost: $5,028 |
$3,773 | 59,130 | $909 | 144 | $(-1,574) | (-288) | - | - | - | - |
$3,773 59,130 kWh |
$909 144 kW-months/year |
$(-1,574) (-288) MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $929 Cost: - |
- | - | - | - | $1,929 | 353 | - | - | $(-1,000) | - |
- - kWh |
- - kW-months/year |
$1,929 353 MMBtu |
- - MMBtu |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $249,427 Cost: $421,694 |
$26,598 | 416,835 | $3,655 | 577 | $355 | 65 | $(-18,181) | (-5,250) | $237,000 | - | $26,598 416,835 kWh |
$3,655 577 kW-months/year |
$355 65 MMBtu |
$(-18,181) (-5,250) MMBtu |
$237,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $29,608 Cost: $46,694 |
$26,598 | 416,835 | $3,655 | 577 | $355 | 65 | - | - | $(-1,000) | - | $26,598 416,835 kWh |
$3,655 577 kW-months/year |
$355 65 MMBtu |
- - MMBtu |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #1 | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #1 | Administrative Changes |