IAC logo
IAC Assessment: OR0714
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0714
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2019
Principal Product Conditioned Air Space
NAICS 561920 - Convention and Trade Show Organizers
SIC 7389 - Business Services, Nec
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 868,000
Annual Production 868,000 Units
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $282,385 5,388,080 kWh $0.05
Electricity Demand $187,287 23,697 kW-months/year $7.90
Electricity Fees $84,551 - $ -
Natural Gas $86,215 10,263 MMBtu $8.40
TOTAL ENERGY COSTS $640,438
RECOMMENDED SAVINGS* $127,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$56,799
Cost:
$168,000
$43,965 736,314 - - $12,834 2,454 $43,965
736,314
kWh
-
-
kW-months/year
$12,834
2,454
MMBtu
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$40,772
Cost:
$23,842
$21,645 362,495 - - $19,127 3,657 $21,645
362,495
kWh
-
-
kW-months/year
$19,127
3,657
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$21,372
Cost:
$29,440
$10,899 182,535 $10,473 1,143 - - $10,899
182,535
kWh
$10,473
1,143
kW-months/year
-
-
MMBtu
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$6,441
Cost:
$23,733
$5,118 85,706 $1,323 144 - - $5,118
85,706
kWh
$1,323
144
kW-months/year
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,732
Cost:
$10,902
- - - - $1,732 331 -
-
kWh
-
-
kW-months/year
$1,732
331
MMBtu
TOTAL RECOMMENDED Savings:
$127,116
Cost:
$255,917
$81,627 1,367,050 $11,796 1,287 $33,693 6,442 $81,627
1,367,050
kWh
$11,796
1,287
kW-months/year
$33,693
6,442
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas