IAC logo
IAC Assessment: OR0721
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0721
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2019
Principal Product Recyclable Materials
NAICS 562920 - Materials Recovery Facilities
SIC 4953 - Refuse Systems
Sales $5,000,000-$10,000,000
# of Employees 160
Plant Area (Sq.Ft.) 190,000
Annual Production 32,561 Tons
Production Hrs. Annual 3,120
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,653 1,147,400 kWh $0.06
Electricity Demand $19,614 4,471 kW-months/year $4.39
Electricity Fees $17,636 - $ -
Natural Gas $13,236 1,576 MMBtu $8.40
Fuel Oil #2 $38,525 1,482 MMBtu $26.00
TOTAL ENERGY COSTS $155,664
RECOMMENDED SAVINGS* $58,237 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$40,539
Cost:
$84,752
$(-1,785) (-34,320) $(-5,610) (-660) $30,153 1,161 $17,781 - - - $(-1,785)
(-34,320)
kWh
$(-5,610)
(-660)
kW-months/year
$30,153
1,161
MMBtu
$17,781
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,383
Cost:
$7,807
$8,322 160,041 $1,742 205 - - $778 - $(-459) - $8,322
160,041
kWh
$1,742
205
kW-months/year
-
-
MMBtu
$778
-
$
$(-459)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,615
Cost:
$5,884
$4,668 71,538 $602 178 - - $332 - $13 - $4,668
71,538
kWh
$602
178
kW-months/year
-
-
MMBtu
$332
-
$
$13
-
$
04: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$1,700
Cost:
$12,122
$1,700 26,048 - - - - - - - - $1,700
26,048
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$58,237
Cost:
$110,565
$12,905 223,307 $(-3,266) (-277) $30,153 1,161 $18,891 - $(-446) - $12,905
223,307
kWh
$(-3,266)
(-277)
kW-months/year
$30,153
1,161
MMBtu
$18,891
-
$
$(-446)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes Primary Raw Material