IAC logo
IAC Assessment: OR0724
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0724
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2019
Principal Product Concrete Block and Brick
NAICS 327331 - Concrete Block and Brick Manufacturing
SIC 3271 - Concrete Block And Brick
Sales <$500,000
# of Employees 35
Plant Area (Sq.Ft.) 1,414,806
Annual Production 14,286,209 Units
Production Hrs. Annual 8,400
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,505 1,828,200 kWh $0.05
Electricity Demand $51,330 6,089 kW-months/year $8.43
Natural Gas $115,504 17,637 MMBtu $6.55
TOTAL ENERGY COSTS $253,339
RECOMMENDED SAVINGS* $73,956 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,104
Cost:
$18,004
- - - - $10,104 - - - -
-
kWh
-
-
kW-months/year
$10,104
-
$
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,124
Cost:
$3,891
$5,679 120,012 $1,445 171 - - - - $5,679
120,012
kWh
$1,445
171
kW-months/year
-
-
$
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$49,629
Cost:
$100,000
- - - - - - $49,629 7,600 -
-
kWh
-
-
kW-months/year
-
-
$
$49,629
7,600
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,637
Cost:
$3,836
$3,417 72,245 $895 106 $325 - - - $3,417
72,245
kWh
$895
106
kW-months/year
$325
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,462
Cost:
$218
$2,361 49,921 $101 12 - - - - $2,361
49,921
kWh
$101
12
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$73,956
Cost:
$125,949
$11,457 242,178 $2,441 289 $10,429 - $49,629 7,600 $11,457
242,178
kWh
$2,441
289
kW-months/year
$10,429
-
$
$49,629
7,600
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas