IAC logo
IAC Assessment: OR0755
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0755
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2022
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2451 - Mobile Homes
Sales $50,000,000-$100,000,000
# of Employees 175
Plant Area (Sq.Ft.) 3,484,800
Annual Production 60,000 Thousand Feet
Production Hrs. Annual 2,600
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,448 6,680,654 kWh $0.04
Electricity Demand $332,887 31,972 kW-months/year $10.41
Electricity Fees $93,309 - $ -
TOTAL ENERGY COSTS $706,644
RECOMMENDED SAVINGS* $5,196,489 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,233
Cost:
-
$3,342 72,612 $6,891 608 - - - - - - $3,342
72,612
kWh
$6,891
608
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,881
Cost:
-
$5,431 118,023 $3,450 304 - - - - - - $5,431
118,023
kWh
$3,450
304
kW-months/year
-
-
$
-
-
$
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,555
Cost:
-
$4,555 98,987 - - - - - - - - $4,555
98,987
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$1,507,357
Cost:
$45,058
- - - - - - $5,760 - $1,501,597 - -
-
kWh
-
-
kW-months/year
-
-
$
$5,760
-
$
$1,501,597
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,503
Cost:
$23,536
$10,503 228,235 - - - - - - - - $10,503
228,235
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,297
Cost:
$55,141
- - - - $13,297 - - - - - -
-
kWh
-
-
kW-months/year
$13,297
-
$
-
-
$
-
-
$
07: 2.1224 REPLACE BOILER Savings:
$3,641,663
Cost:
$6,124,080
$4,689,720 62,529,595 - - $706,645 - - - $(-1,754,702) - $4,689,720
62,529,595
kWh
-
-
kW-months/year
$706,645
-
$
-
-
$
$(-1,754,702)
-
$
TOTAL RECOMMENDED Savings:
$5,196,489
Cost:
$6,247,815
$4,713,551 63,047,452 $10,341 912 $719,942 - $5,760 - $(-253,105) - $4,713,551
63,047,452
kWh
$10,341
912
kW-months/year
$719,942
-
$
$5,760
-
$
$(-253,105)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes