IAC Assessment: OR0781
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0781
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2023
Principal Product Aggregate
NAICS 212321 - Construction Sand and Gravel Mining
SIC 1442 - Construction Sand And Gravel
Sales $10,000,000-$50,000,000
# of Employees 24
Plant Area (Sq.Ft.) 1,700,000
Annual Production 1,200,000 Tons
Production Hrs. Annual 2,860
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $122,277 2,339,335 kWh $0.05
Electricity Demand $156,890 13,810 kW-months/year $11.36
Electricity Fees $1,034 - $ -
Other Energy $313,837 11,403 MMBtu $27.52
TOTAL ENERGY COSTS $594,038
RECOMMENDED SAVINGS* $604,077 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $618
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Energy One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Other Energy One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$112,997
Cost:
$116,429
- - - - - - $40,363 1,443 $72,634 - -
-
kWh
-
-
kW-months/year
-
-
$
$40,363
1,443
MMBtu
$72,634
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,665
Cost:
$20,839
- - - - $3,665 - - - - - -
-
kWh
-
-
kW-months/year
$3,665
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$618
Cost:
$2,576
$618 11,815 - - - - - - - - $618
11,815
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$486,797
Cost:
$4,030,000
$(-45,001) (-860,937) $(-61,021) (-5,367) - - $150,352 4,132 $442,467 - $(-45,001)
(-860,937)
kWh
$(-61,021)
(-5,367)
kW-months/year
-
-
$
$150,352
4,132
MMBtu
$442,467
-
$
TOTAL RECOMMENDED Savings:
$604,077
Cost:
$4,169,844
$(-44,383) (-849,122) $(-61,021) (-5,367) $3,665 - $190,715 5,575 $515,101 - $(-44,383)
(-849,122)
kWh
$(-61,021)
(-5,367)
kW-months/year
$3,665
-
$
$190,715
5,575
MMBtu
$515,101
-
$
TOTAL IMPLEMENTED Savings:
$618
Cost:
$2,576
$618 11,815 - - - - - - - - $618
11,815
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Other Energy One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Other Energy One-time Revenue or Avoided Cost