IAC logo
IAC Assessment: OR0785
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0785
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2023
Principal Product Accordion Doors
NAICS 321911 - Wood Window and Door Manufacturing
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 170,000
Annual Production 47 Thousand Feet
Production Hrs. Annual 2,040
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,853 439,912 kWh $0.05
Electricity Demand $22,612 3,106 kW-months/year $7.28
Electricity Fees $7,345 - $ -
Natural Gas $39,951 4,426 MMBtu $9.03
LPG $2,721 72 MMBtu $37.79
Other Gas $3,652 1 MMBtu $3,652.00
TOTAL ENERGY COSTS $104,842
RECOMMENDED SAVINGS* $1,219,314 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,209,151
Cost:
$28,500
- - - - - - - - $1,209,151 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,209,151
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,224
Cost:
$1,583
- - - - - - $4,224 469 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,224
469
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,141
Cost:
$4,510
- - - - $3,141 - - - - - -
-
kWh
-
-
kW-months/year
$3,141
-
$
-
-
MMBtu
-
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,475
Cost:
$16,140
$1,357 26,112 $1,118 154 - - - - - - $1,357
26,112
kWh
$1,118
154
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$323
Cost:
-
$149 2,871 $174 24 - - - - - - $149
2,871
kWh
$174
24
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,219,314
Cost:
$50,733
$1,506 28,983 $1,292 178 $3,141 - $4,224 469 $1,209,151 - $1,506
28,983
kWh
$1,292
178
kW-months/year
$3,141
-
$
$4,224
469
MMBtu
$1,209,151
-
$
TOTAL IMPLEMENTED Savings:
-