IAC logo
IAC Assessment: OR0789
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0789
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2024
Principal Product Recycled sorted metal
NAICS 331491 - Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and Extruding
SIC 3399 - Primary Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 54
Plant Area (Sq.Ft.) 117,000
Annual Production 18,000 Tons
Production Hrs. Annual 2,600
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,000 1,258,640 kWh $0.08
Electricity Demand $112,944 9,556 kW-months/year $11.82
Electricity Fees $31,217 - $ -
Natural Gas $3,472 272 MMBtu $12.76
Fuel Oil #1 $4,278 126 MMBtu $34.02
TOTAL ENERGY COSTS $248,659
RECOMMENDED SAVINGS* $27,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,498
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,513
Cost:
-
$4,513 59,792 - - - - - - $4,513
59,792
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,616
Cost:
$14,338
- - - - - - $1,616 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,616
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$4,115
Cost:
$1,800
$(-163) (-2,162) - - $4,278 126 - - $(-163)
(-2,162)
kWh
-
-
kW-months/year
$4,278
126
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$985
Cost:
-
$564 7,470 $421 36 - - - - $564
7,470
kWh
$421
36
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$16,245
Cost:
$4,904
$2,636 34,923 $13,609 1,151 - - - - $2,636
34,923
kWh
$13,609
1,151
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$27,474
Cost:
$21,042
$7,550 100,023 $14,030 1,187 $4,278 126 $1,616 - $7,550
100,023
kWh
$14,030
1,187
kW-months/year
$4,278
126
MMBtu
$1,616
-
$
TOTAL IMPLEMENTED Savings:
$5,498
Cost:
-
$5,077 67,262 $421 36 - - - - $5,077
67,262
kWh
$421
36
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes