IAC Assessment: OR0794
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0794
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2024
Principal Product Manufactured homes
NAICS 321991 - Manufactured Home (Mobile Home) Manufacturing
SIC 2451 - Mobile Homes
Sales $50,000,000-$100,000,000
# of Employees 212
Plant Area (Sq.Ft.) 168,000
Annual Production 880 Units
Production Hrs. Annual 6,120
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,391 720,914 kWh $0.07
Electricity Demand $40,784 2,992 kW-months/year $13.63
Electricity Fees $5,097 - $ -
Natural Gas $19,906 1,856 MMBtu $10.73
LPG $14,463 621 MMBtu $23.28
TOTAL ENERGY COSTS $128,641
RECOMMENDED SAVINGS* $51,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,236
Cost:
$1,629
- - - - $1,236 113 - - - - - - -
-
kWh
-
-
kW-months/year
$1,236
113
MMBtu
-
-
MMBtu
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,287
Cost:
$5,523
$2,287 34,077 - - - - - - - - - - $2,287
34,077
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$20,545
Cost:
$92,473
$(-9,181) (-136,782) - - - - $14,463 621 $12,590 - $2,673 - $(-9,181)
(-136,782)
kWh
-
-
kW-months/year
-
-
MMBtu
$14,463
621
MMBtu
$12,590
-
$
$2,673
-
$
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$12,662
Cost:
$67,250
$8,246 122,809 $4,416 324 - - - - - - - - $8,246
122,809
kWh
$4,416
324
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,153
Cost:
$7,546
$1,153 17,180 - - - - - - - - - - $1,153
17,180
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$13,489
Cost:
$12,623
$6,898 102,765 $6,591 484 - - - - - - - - $6,898
102,765
kWh
$6,591
484
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$51,372
Cost:
$187,044
$9,403 140,049 $11,007 808 $1,236 113 $14,463 621 $12,590 - $2,673 - $9,403
140,049
kWh
$11,007
808
kW-months/year
$1,236
113
MMBtu
$14,463
621
MMBtu
$12,590
-
$
$2,673
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes Administrative Changes