IAC logo
IAC Assessment: OR0797
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0797
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2024
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 7
Plant Area (Sq.Ft.) 1,608,337
Annual Production 839,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,261 1,004,378 kWh $0.08
Electricity Demand $20,547 2,764 kW-months/year $7.43
Electricity Fees $10,483 - $ -
Natural Gas $33,857 3,100 MMBtu $10.92
TOTAL ENERGY COSTS $149,148
RECOMMENDED SAVINGS* $66,895 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$4,211
Cost:
$17,825
$4,211 62,016 - - - - - - $4,211
62,016
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$2,639
Cost:
$227
$2,639 31,454 - - - - - - $2,639
31,454
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$7,711
Cost:
$22,822
$191 2,282 - - $3,200 - $4,320 - $191
2,282
kWh
-
-
kW-months/year
$3,200
-
$
$4,320
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,405
Cost:
$16,073
$3,066 36,551 $339 46 - - - - $3,066
36,551
kWh
$339
46
kW-months/year
-
-
$
-
-
$
05: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$5,114
Cost:
$43,821
$4,561 54,372 $553 75 - - - - $4,561
54,372
kWh
$553
75
kW-months/year
-
-
$
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$43,815
Cost:
$607,740
$37,841 451,033 $5,974 804 - - - - $37,841
451,033
kWh
$5,974
804
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$66,895
Cost:
$708,508
$52,509 637,708 $6,866 924 $3,200 - $4,320 - $52,509
637,708
kWh
$6,866
924
kW-months/year
$3,200
-
$
$4,320
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Primary Raw Material Ancillary Material Cost