IAC Assessment: OR0801
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0801
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2024
Principal Product Dimensional Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $5,000,000-$10,000,000
# of Employees 25
Plant Area (Sq.Ft.) 174,240
Annual Production 2,562 Thousand Feet
Production Hrs. Annual 2,168
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,332 1,289,540 kWh $0.07
Electricity Demand $63,326 8,387 kW-months/year $7.55
Electricity Fees $26,624 - $ -
TOTAL ENERGY COSTS $178,282
RECOMMENDED SAVINGS* $70,061 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$1,848
Cost:
-
- - - - - - $1,848 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,848
-
$
02: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$42,000
Cost:
$50,000
$42,000 629,025 - - - - - - $42,000
629,025
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$15,143
Cost:
$44,093
- - - - $15,143 - - - -
-
kWh
-
-
kW-months/year
$15,143
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,400
Cost:
$6,763
$1,564 22,828 $836 111 - - - - $1,564
22,828
kWh
$836
111
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,786
Cost:
$5,438
$1,216 17,755 $570 76 - - - - $1,216
17,755
kWh
$570
76
kW-months/year
-
-
$
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$6,884
Cost:
$92,435
$4,731 69,059 $2,153 285 - - - - $4,731
69,059
kWh
$2,153
285
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$70,061
Cost:
$198,729
$49,511 738,667 $3,559 472 $15,143 - $1,848 - $49,511
738,667
kWh
$3,559
472
kW-months/year
$15,143
-
$
$1,848
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Ancillary Material Cost