IAC logo
IAC Assessment: OR0805
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0805
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2025
Principal Product Ink Cartridges
NAICS 339940 - Office Supplies (except Paper) Manufacturing
SIC 3955 - Carbon Paper And Inked Ribbons
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 185,000
Annual Production 27,000,000 Units
Production Hrs. Annual 6,000
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $402,060 5,818,800 kWh $0.07
Electricity Demand $224,551 12,902 kW-months/year $17.40
Electricity Fees $66,608 - $ -
Natural Gas $21,912 1,842 MMBtu $11.90
Fuel Oil #1 $3,964 156 MMBtu $25.41
TOTAL ENERGY COSTS $730,723
RECOMMENDED SAVINGS* $143,715 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #1 Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$26,892
Cost:
-
$26,892 389,180 - - - - - - $26,892
389,180
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$2,187
Cost:
-
$2,187 31,560 - - - - - - $2,187
31,560
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$928
Cost:
-
$928 13,423 - - - - - - $928
13,423
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,157
Cost:
$3,706
$3,057 44,241 $1,100 63 - - - - $3,057
44,241
kWh
$1,100
63
kW-months/year
-
-
MMBtu
-
-
lb
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$5,605
Cost:
-
- - - - $1,321 51 $4,284 37,479 -
-
kWh
-
-
kW-months/year
$1,321
51
MMBtu
$4,284
37,479
lb
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$103,946
Cost:
$1,750,000
$57,699 835,286 $46,247 2,658 - - - - $57,699
835,286
kWh
$46,247
2,658
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$143,715
Cost:
$1,753,706
$90,763 1,313,690 $47,347 2,721 $1,321 51 $4,284 37,479 $90,763
1,313,690
kWh
$47,347
2,721
kW-months/year
$1,321
51
MMBtu
$4,284
37,479
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Fuel Oil #1 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #1 Solid Waste (non-haz)