Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2025 |
Principal Product | Ink Cartridges |
NAICS | 339940 - Office Supplies (except Paper) Manufacturing |
SIC | 3955 - Carbon Paper And Inked Ribbons |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 185,000 |
Annual Production | 27,000,000 Units |
Production Hrs. Annual | 6,000 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $402,060 | 5,818,800 | kWh | $0.07 |
Electricity Demand | $224,551 | 12,902 | kW-months/year | $17.40 |
Electricity Fees | $66,608 | - | $ | - |
Natural Gas | $21,912 | 1,842 | MMBtu | $11.90 |
Fuel Oil #1 | $3,964 | 156 | MMBtu | $25.41 |
TOTAL ENERGY COSTS | $730,723 | |||
RECOMMENDED SAVINGS* | $143,715 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #1 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #1 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $26,892 Cost: - |
$26,892 | 389,180 | - | - | - | - | - | - |
$26,892 389,180 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $2,187 Cost: - |
$2,187 | 31,560 | - | - | - | - | - | - |
$2,187 31,560 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $928 Cost: - |
$928 | 13,423 | - | - | - | - | - | - |
$928 13,423 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,157 Cost: $3,706 |
$3,057 | 44,241 | $1,100 | 63 | - | - | - | - |
$3,057 44,241 kWh |
$1,100 63 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $5,605 Cost: - |
- | - | - | - | $1,321 | 51 | $4,284 | 37,479 |
- - kWh |
- - kW-months/year |
$1,321 51 MMBtu |
$4,284 37,479 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $103,946 Cost: $1,750,000 |
$57,699 | 835,286 | $46,247 | 2,658 | - | - | - | - |
$57,699 835,286 kWh |
$46,247 2,658 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $143,715 Cost: $1,753,706 |
$90,763 | 1,313,690 | $47,347 | 2,721 | $1,321 | 51 | $4,284 | 37,479 | $90,763 1,313,690 kWh |
$47,347 2,721 kW-months/year |
$1,321 51 MMBtu |
$4,284 37,479 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #1 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Fuel Oil #1 | Solid Waste (non-haz) |