Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2025
Principal Product plastic tubing, metal cables, and metal wire for medical devices
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 260,000
Annual Production 20,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $378,909 5,900,700 kWh $0.06
Electricity Demand $188,302 11,502 kW-months/year $16.37
Electricity Fees $42,299 - $ -
Natural Gas $15,281 1,125 MMBtu $13.58
TOTAL ENERGY COSTS $672,297
RECOMMENDED SAVINGS* $82,383 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$56,788
Cost:
$960,069
$48,793 759,513 $7,995 488 - - $48,793
759,513
kWh
$7,995
488
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,490
Cost:
$1,927
$3,291 51,254 $1,199 73 - - $3,291
51,254
kWh
$1,199
73
kW-months/year
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,880
Cost:
$211
$2,525 39,331 $1,354 83 - - $2,525
39,331
kWh
$1,354
83
kW-months/year
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,542
Cost:
$5,699
$1,143 17,801 $399 24 - - $1,143
17,801
kWh
$399
24
kW-months/year
-
-
$
05: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$15,683
Cost:
$76,301
$(-2,115) (-32,935) $(-1,078) (-66) $18,876 - $(-2,115)
(-32,935)
kWh
$(-1,078)
(-66)
kW-months/year
$18,876
-
$
TOTAL RECOMMENDED Savings:
$82,383
Cost:
$1,044,207
$53,638 834,965 $9,869 603 $18,876 - $53,638
834,965
kWh
$9,869
603
kW-months/year
$18,876
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost