IAC logo
IAC Assessment: OR0807
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0807
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2025
Principal Product Emulsions
NAICS 325510 - Paint and Coating Manufacturing
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 11
Plant Area (Sq.Ft.) 79,880
Annual Production 19,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,781 371,640 kWh $0.08
Electricity Demand $43,593 2,195 kW-months/year $19.86
Electricity Fees $6,537 - $ -
Natural Gas $74,572 8,579 MMBtu $8.69
LPG $5,061 96 MMBtu $52.72
TOTAL ENERGY COSTS $178,548
RECOMMENDED SAVINGS* $15,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,168
Cost:
$10,530
$2,028 25,313 $2,930 151 $3,210 - $2,028
25,313
kWh
$2,930
151
kW-months/year
$3,210
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,721
Cost:
$7,534
$1,054 13,149 $1,667 86 - - $1,054
13,149
kWh
$1,667
86
kW-months/year
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$753
Cost:
$2,323
$346 4,323 $407 21 - - $346
4,323
kWh
$407
21
kW-months/year
-
-
$
04: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$3,635
Cost:
$16,079
$3,635 45,362 - - - - $3,635
45,362
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$15,277
Cost:
$36,466
$7,063 88,147 $5,004 258 $3,210 - $7,063
88,147
kWh
$5,004
258
kW-months/year
$3,210
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost