IAC logo
IAC Assessment: ORC010
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ORC010
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2023
Principal Product Support Services
NAICS 611210 - Junior Colleges
SIC 8222 - Junior Colleges
Sales <$500,000
# of Employees 30
Plant Area (Sq.Ft.) 44,240
Annual Production 100 Pieces
Production Hrs. Annual 3,380
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,843 763,440 kWh $0.06
Electricity Demand $14,557 1,878 kW-months/year $7.75
Electricity Fees $8,405 - $ -
Natural Gas $31,394 4,034 MMBtu $7.78
TOTAL ENERGY COSTS $100,199
RECOMMENDED SAVINGS* $31,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,713
Cost:
$12,000
$1,650 27,479 $63 8 - - $1,650
27,479
kWh
$63
8
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,211
Cost:
$2,500
$1,211 20,163 - - - - $1,211
20,163
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.1224 REPLACE BOILER Savings:
$3,391
Cost:
$30,000
- - - - $3,391 436 -
-
kWh
-
-
kW-months/year
$3,391
436
MMBtu
04: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION Savings:
$8,755
Cost:
$1,000
$4,720 78,609 - - $4,035 518 $4,720
78,609
kWh
-
-
kW-months/year
$4,035
518
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,690
Cost:
$1,000
$643 10,704 - - $16,047 2,062 $643
10,704
kWh
-
-
kW-months/year
$16,047
2,062
MMBtu
TOTAL RECOMMENDED Savings:
$31,760
Cost:
$46,500
$8,224 136,955 $63 8 $23,473 3,016 $8,224
136,955
kWh
$63
8
kW-months/year
$23,473
3,016
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas