Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oregon State University |
---|---|
Assessment Year | 2023 |
Principal Product | Support Services |
NAICS | 611210 - Junior Colleges |
SIC | 8222 - Junior Colleges |
Sales | <$500,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 44,240 |
Annual Production | 100 Pieces |
Production Hrs. Annual | 3,380 |
Location (State) | OR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $45,843 | 763,440 | kWh | $0.06 |
Electricity Demand | $14,557 | 1,878 | kW-months/year | $7.75 |
Electricity Fees | $8,405 | - | $ | - |
Natural Gas | $31,394 | 4,034 | MMBtu | $7.78 |
TOTAL ENERGY COSTS | $100,199 | |||
RECOMMENDED SAVINGS* | $31,760 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,690 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,713 Cost: $12,000 |
$1,650 | 27,479 | $63 | 8 | - | - |
$1,650 27,479 kWh |
$63 8 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,211 Cost: $2,500 |
$1,211 | 20,163 | - | - | - | - |
$1,211 20,163 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1224 REPLACE BOILER |
Savings: $3,391 Cost: $30,000 |
- | - | - | - | $3,391 | 436 |
- - kWh |
- - kW-months/year |
$3,391 436 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7264 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION |
Savings: $8,755 Cost: $1,000 |
$4,720 | 78,609 | - | - | $4,035 | 518 |
$4,720 78,609 kWh |
- - kW-months/year |
$4,035 518 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $16,690 Cost: - |
$643 | 10,704 | - | - | $16,047 | 2,062 |
$643 10,704 kWh |
- - kW-months/year |
$16,047 2,062 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $31,760 Cost: $45,500 |
$8,224 | 136,955 | $63 | 8 | $23,473 | 3,016 | $8,224 136,955 kWh |
$63 8 kW-months/year |
$23,473 3,016 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,690 Cost: - |
$643 | 10,704 | - | - | $16,047 | 2,062 | $643 10,704 kWh |
- - kW-months/year |
$16,047 2,062 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |