IAC logo
IAC Assessment: ORS002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ORS002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Processed fish products
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 306
Plant Area (Sq.Ft.) 50,000
Annual Production 10,517,176 Pounds
Production Hrs. Annual 2,175
Location (State) AK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,395 2,928,781 kWh $0.06
Electricity Demand $127,512 110,640 kW-months/year $1.15
Electricity Fees $44,106 - $ -
LPG $8,707 698 MMBtu $12.47
Fuel Oil #6 $116,926 30,531 MMBtu $3.83
TOTAL ENERGY COSTS $487,844
RECOMMENDED SAVINGS* $360,421 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $202,461
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Personnel Changes Water Consumption Electricity Usage Electricity Demand Fuel Oil #6 Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,472
Cost:
$27,939
$8,925 151,524 $4,547 329 - - - - - - $8,925
151,524
kWh
$4,547
329
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,055
Cost:
$15,400
$2,020 34,291 $2,035 883 - - - - - - $2,020
34,291
kWh
$2,035
883
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$880
Cost:
$700
- - - - $880 315 - - - - -
-
kWh
-
-
kW-months/year
$880
315
MMBtu
-
-
$
-
-
Tgal
04: 2.1224 REPLACE BOILER Savings:
$12,100
Cost:
-
- - - - $12,100 4,366 - - - - -
-
kWh
-
-
kW-months/year
$12,100
4,366
MMBtu
-
-
$
-
-
Tgal
05: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$166,000
Cost:
$121,000
- - - - - - $166,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$166,000
-
$
-
-
Tgal
06: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$90,560
Cost:
$64,000
$(-180) (-2,931) $(-160) (-47) - - $90,900 - - - $(-180)
(-2,931)
kWh
$(-160)
(-47)
kW-months/year
-
-
MMBtu
$90,900
-
$
-
-
Tgal
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$67,400
Cost:
$200,000
- - - - - - $67,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$67,400
-
$
-
-
Tgal
08: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING Savings:
$5,954
Cost:
-
- - - - - - - - $5,954 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$5,954
-
Tgal
TOTAL RECOMMENDED Savings:
$360,421
Cost:
$429,039
$10,765 182,884 $6,422 1,165 $12,980 4,681 $324,300 - $5,954 - $10,765
182,884
kWh
$6,422
1,165
kW-months/year
$12,980
4,681
MMBtu
$324,300
-
$
$5,954
-
Tgal
TOTAL IMPLEMENTED Savings:
$202,461
Cost:
$165,039
$10,945 185,815 $6,582 1,212 $12,980 4,681 $166,000 - $5,954 - $10,945
185,815
kWh
$6,582
1,212
kW-months/year
$12,980
4,681
MMBtu
$166,000
-
$
$5,954
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Fuel Oil #6 Personnel Changes Water Consumption Electricity Usage Electricity Demand Fuel Oil #6 Personnel Changes Water Consumption