IAC logo
IAC Assessment: ORS005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ORS005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1999
Principal Product Processed Fish
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 50,000
Annual Production 15,148,484 Pounds
Production Hrs. Annual 5,160
Location (State) AK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $613,805 4,640,973 kWh $0.13
Electricity Fees $61,520 - $ -
LPG $44,407 1,443 MMBtu $30.77
Fuel Oil #2 $74,987 12,438 MMBtu $6.03
TOTAL ENERGY COSTS $845,465
RECOMMENDED SAVINGS* $1,406,270 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $414,706
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Water Disposal Personnel Changes Primary Product Electricity Usage Fuel Oil #2 Water Disposal Personnel Changes Primary Product
$ kWh $ MMBtu $ Tgal $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$23,531
Cost:
$41,296
$23,531 161,782 - - - - - - - - $23,531
161,782
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$403,875
Cost:
$572,000
$675,325 4,640,973 $(-271,450) (-45,242) - - - - - - $675,325
4,640,973
kWh
$(-271,450)
(-45,242)
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$55,755
Cost:
-
$55,755 383,060 - - - - - - - - $55,755
383,060
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$18,500
Cost:
$40,000
$18,500 127,198 - - - - - - - - $18,500
127,198
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,920
Cost:
$700
- - $6,920 1,145 - - - - - - -
-
kWh
$6,920
1,145
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$97,200
Cost:
$11,600
- - - - - - $97,200 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$97,200
-
$
-
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$350,000
Cost:
$570,000
- - - - - - $350,000 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$350,000
-
$
-
-
$
08: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$139,000
Cost:
$280,000
- - - - - - $139,000 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$139,000
-
$
-
-
$
09: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$310,000
Cost:
$69,000
- - - - - - - - $310,000 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
$310,000
-
$
10: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
-
Cost:
$490
- - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
11: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$1,489
Cost:
$6,220
$(-101) (-586) - - $1,590 1,935,000 - - - - $(-101)
(-586)
kWh
-
-
MMBtu
$1,590
1,935,000
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,406,270
Cost:
$1,591,306
$773,010 5,312,427 $(-264,530) (-44,097) $1,590 1,935,000 $586,200 - $310,000 - $773,010
5,312,427
kWh
$(-264,530)
(-44,097)
MMBtu
$1,590
1,935,000
Tgal
$586,200
-
$
$310,000
-
$
TOTAL IMPLEMENTED Savings:
$414,706
Cost:
$151,486
$97,786 672,040 $6,920 1,145 - - - - $310,000 - $97,786
672,040
kWh
$6,920
1,145
MMBtu
-
-
Tgal
-
-
$
$310,000
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ $
Electricity Usage Fuel Oil #2 Water Disposal Personnel Changes Primary Product Electricity Usage Fuel Oil #2 Water Disposal Personnel Changes Primary Product