Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1988
Principal Product MIRRORS AND FRAMES
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 204
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pieces
Production Hrs. Annual 2,805
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,475 453,107 kWh $0.10
Natural Gas $42,286 6,916 MMBtu $6.11
TOTAL ENERGY COSTS $89,761
RECOMMENDED SAVINGS* $11,795 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,499
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$395
Cost:
$80
$395 3,810 - - $395
3,810
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$985
Cost:
-
$985 9,379 - - $985
9,379
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$322
Cost:
$202
$322 3,224 - - $322
3,224
kWh
-
-
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$901
Cost:
-
- - $901 148 -
-
kWh
$901
148
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$9,192
Cost:
$7,170
- - $9,192 1,507 -
-
kWh
$9,192
1,507
MMBtu
TOTAL RECOMMENDED Savings:
$11,795
Cost:
$7,452
$1,702 16,413 $10,093 1,655 $1,702
16,413
kWh
$10,093
1,655
MMBtu
TOTAL IMPLEMENTED Savings:
$10,499
Cost:
$7,372
$1,307 12,603 $9,192 1,507 $1,307
12,603
kWh
$9,192
1,507
MMBtu
Savings
Cost
$ kWh $ MMBtu