IAC logo
IAC Assessment: RU0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1988
Principal Product LAND MOBILE COMMERCIAL PRODUCTS
NAICS n/a
SIC 3663 - Radio & Tv Communications Equipment
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pieces
Production Hrs. Annual 2,423
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,036 1,557,737 kWh $0.09
Natural Gas $47,618 9,033 MMBtu $5.27
TOTAL ENERGY COSTS $188,654
RECOMMENDED SAVINGS* $9,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,481
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,128
Cost:
$370
$1,128 12,896 - - $1,128
12,896
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$302
Cost:
-
$302 3,224 - - $302
3,224
kWh
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$109
Cost:
-
$109 1,172 - - $109
1,172
kWh
-
-
MMBtu
04: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$956
Cost:
$800
$956 10,551 - - $956
10,551
kWh
-
-
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,480
Cost:
$2,151
- - $2,480 468 -
-
kWh
$2,480
468
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,095
Cost:
$400
$2,325 25,791 $1,770 334 $2,325
25,791
kWh
$1,770
334
MMBtu
TOTAL RECOMMENDED Savings:
$9,070
Cost:
$3,721
$4,820 53,634 $4,250 802 $4,820
53,634
kWh
$4,250
802
MMBtu
TOTAL IMPLEMENTED Savings:
$6,481
Cost:
$1,570
$4,711 52,462 $1,770 334 $4,711
52,462
kWh
$1,770
334
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas