IAC logo
IAC Assessment: RU0022
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0022
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1988
Principal Product BROCHURES, FOLDERS
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 600,000 Pieces
Production Hrs. Annual 4,082
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,507 1,488,863 kWh $0.10
Natural Gas $17,563 2,781 MMBtu $6.32
Fuel Oil #2 $2,681 508 MMBtu $5.28
TOTAL ENERGY COSTS $161,751
RECOMMENDED SAVINGS* $5,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,719
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,410
Cost:
$252
$1,410 14,947 - - $1,410
14,947
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$306
Cost:
-
$306 3,224 - - $306
3,224
kWh
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$315
Cost:
-
$315 3,224 - - $315
3,224
kWh
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,606
Cost:
$2,800
- - $1,606 254 -
-
kWh
$1,606
254
MMBtu
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,352
Cost:
$1,575
$139 1,465 $1,213 192 $139
1,465
kWh
$1,213
192
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$651
Cost:
$717
- - $651 103 -
-
kWh
$651
103
MMBtu
TOTAL RECOMMENDED Savings:
$5,640
Cost:
$5,344
$2,170 22,860 $3,470 549 $2,170
22,860
kWh
$3,470
549
MMBtu
TOTAL IMPLEMENTED Savings:
$3,719
Cost:
$2,544
$1,855 19,636 $1,864 295 $1,855
19,636
kWh
$1,864
295
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas