IAC Assessment: RU0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1988
Principal Product FIBERGLASS TANKS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 46
Plant Area (Sq.Ft.) 0
Annual Production 500 Pieces
Production Hrs. Annual 3,276
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,605 678,781 kWh $0.11
Natural Gas $27,299 5,570 MMBtu $4.90
Fuel Oil #2 $26,208 4,586 MMBtu $5.71
TOTAL ENERGY COSTS $131,112
RECOMMENDED SAVINGS* $26,127 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,611
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,449
Cost:
$4,244
$2,449 22,274 - - - - $2,449
22,274
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$3,900
Cost:
$26,730
- - $3,900 796 - - -
-
kWh
$3,900
796
MMBtu
-
-
MMBtu
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,637
Cost:
$2,780
$275 2,638 $2,362 479 - - $275
2,638
kWh
$2,362
479
MMBtu
-
-
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,523
Cost:
$2,268
$(-456) (-4,103) $2,979 608 - - $(-456)
(-4,103)
kWh
$2,979
608
MMBtu
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,611
Cost:
-
$1,611 14,654 - - - - $1,611
14,654
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,145
Cost:
$2,600
- - - - $3,145 597 -
-
kWh
-
-
MMBtu
$3,145
597
MMBtu
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$9,862
Cost:
$4,000
$9,862 89,683 - - - - $9,862
89,683
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,127
Cost:
$42,622
$13,741 125,146 $9,241 1,883 $3,145 597 $13,741
125,146
kWh
$9,241
1,883
MMBtu
$3,145
597
MMBtu
TOTAL IMPLEMENTED Savings:
$1,611
Cost:
-
$1,611 14,654 - - - - $1,611
14,654
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2