IAC Assessment: RU0043
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0043
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1988
Principal Product HOUSEHOLD PRODUCTS
NAICS n/a
SIC 2841 - Soap And Other Detergents
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 0
Annual Production 5,000 Thousand Gallons
Production Hrs. Annual 4,335
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,138 2,056,858 kWh $0.06
Natural Gas $87,032 18,269 MMBtu $4.76
TOTAL ENERGY COSTS $213,170
RECOMMENDED SAVINGS* $32,410 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,864
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,773
Cost:
-
$4,773 78,253 - - $4,773
78,253
kWh
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$6,546
Cost:
$7,020
$(-486) (-7,913) $7,032 1,465 $(-486)
(-7,913)
kWh
$7,032
1,465
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$298
Cost:
$800
$298 4,982 - - $298
4,982
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,890
Cost:
$678
$2,890 47,479 - - $2,890
47,479
kWh
-
-
MMBtu
05: 2.2164 TURN OFF STEAM TRACING DURING MILD WEATHER Savings:
$9,235
Cost:
-
- - $9,235 1,924 -
-
kWh
$9,235
1,924
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,858
Cost:
$1,195
- - $4,858 1,012 -
-
kWh
$4,858
1,012
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,812
Cost:
$384
$2,812 46,014 - - $2,812
46,014
kWh
-
-
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$998
Cost:
$500
- - $998 208 -
-
kWh
$998
208
MMBtu
TOTAL RECOMMENDED Savings:
$32,410
Cost:
$10,577
$10,287 168,815 $22,123 4,609 $10,287
168,815
kWh
$22,123
4,609
MMBtu
TOTAL IMPLEMENTED Savings:
$25,864
Cost:
$3,557
$10,773 176,728 $15,091 3,144 $10,773
176,728
kWh
$15,091
3,144
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas