IAC logo
IAC Assessment: RU0081
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0081
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1990
Principal Product FOAM CARPET PADDING
NAICS n/a
SIC 2299 - Textile Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 0
Annual Production 135,000 Thousand Feet
Production Hrs. Annual 4,250
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,370 2,279,015 kWh $0.10
Natural Gas $33,148 8,229 MMBtu $4.03
TOTAL ENERGY COSTS $263,518
RECOMMENDED SAVINGS* $20,102 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,133
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,465
Cost:
$350
$1,465 14,654 - - $1,465
14,654
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,110
Cost:
-
$2,110 20,809 - - $2,110
20,809
kWh
-
-
MMBtu
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$3,237
Cost:
$800
$3,237 31,946 - - $3,237
31,946
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,558
Cost:
$11,400
$4,558 45,135 - - $4,558
45,135
kWh
-
-
MMBtu
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,360
Cost:
$3,240
$(-360) (-3,517) $2,720 675 $(-360)
(-3,517)
kWh
$2,720
675
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,212
Cost:
-
$4,212 41,618 - - $4,212
41,618
kWh
-
-
MMBtu
07: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,160
Cost:
$565
- - $2,160 536 -
-
kWh
$2,160
536
MMBtu
TOTAL RECOMMENDED Savings:
$20,102
Cost:
$16,355
$15,222 150,645 $4,880 1,211 $15,222
150,645
kWh
$4,880
1,211
MMBtu
TOTAL IMPLEMENTED Savings:
$8,133
Cost:
$11,750
$8,133 80,598 - - $8,133
80,598
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas