IAC Assessment: RU0088
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0088
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1990
Principal Product FLOOR TILES
NAICS n/a
SIC 3299 - Nonmetallic Mineral Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 270
Plant Area (Sq.Ft.) 0
Annual Production 14,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,446,060 19,812,134 kWh $0.07
Natural Gas $367,903 80,275 MMBtu $4.58
TOTAL ENERGY COSTS $1,813,963
RECOMMENDED SAVINGS* $150,583 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $851
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,114
Cost:
-
$3,114 42,790 - - $3,114
42,790
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,045
Cost:
$68
$2,045 28,136 - - $2,045
28,136
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$851
Cost:
$650
$851 11,723 - - $851
11,723
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,127
Cost:
-
$8,127 111,372 - - $8,127
111,372
kWh
-
-
MMBtu
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$16,127
Cost:
$800
$16,127 220,985 - - $16,127
220,985
kWh
-
-
MMBtu
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$109,585
Cost:
$50,000
- - $109,585 - -
-
kWh
$109,585
-
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,543
Cost:
-
- - $2,543 794 -
-
kWh
$2,543
794
MMBtu
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$265
Cost:
$156
- - $265 82 -
-
kWh
$265
82
MMBtu
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,926
Cost:
$13,500
$10,947 150,059 $(-3,021) (-512) $10,947
150,059
kWh
$(-3,021)
(-512)
MMBtu
TOTAL RECOMMENDED Savings:
$150,583
Cost:
$65,174
$41,211 565,065 $109,372 364 $41,211
565,065
kWh
$109,372
364
MMBtu
TOTAL IMPLEMENTED Savings:
$851
Cost:
$650
$851 11,723 - - $851
11,723
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas