IAC Assessment: RU0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1990
Principal Product PUTTY KNIVES & SCRAPERS
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 0
Annual Production 12,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $299,765 3,502,052 kWh $0.09
Natural Gas $52,485 9,142 MMBtu $5.74
Fuel Oil #4 $8,377 1,872 MMBtu $4.47
TOTAL ENERGY COSTS $360,627
RECOMMENDED SAVINGS* $26,702 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,706
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$592
Cost:
-
$592 7,034 - - $592
7,034
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$513
Cost:
$419
$513 6,155 - - $513
6,155
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,006
Cost:
$630
$2,006 23,447 - - $2,006
23,447
kWh
-
-
MMBtu
04: 2.2514 COVER OPEN TANKS Savings:
$433
Cost:
$500
- - $433 76 -
-
kWh
$433
76
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,477
Cost:
-
$1,477 17,292 - - $1,477
17,292
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$996
Cost:
$1,250
$996 11,723 - - $996
11,723
kWh
-
-
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$20,685
Cost:
$63,000
$26,821 313,306 $(-6,136) (-1,069) $26,821
313,306
kWh
$(-6,136)
(-1,069)
MMBtu
TOTAL RECOMMENDED Savings:
$26,702
Cost:
$65,799
$32,405 378,957 $(-5,703) (-993) $32,405
378,957
kWh
$(-5,703)
(-993)
MMBtu
TOTAL IMPLEMENTED Savings:
$25,706
Cost:
$64,549
$31,409 367,234 $(-5,703) (-993) $31,409
367,234
kWh
$(-5,703)
(-993)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas