IAC logo
IAC Assessment: RU0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1991
Principal Product PLASTIC CONTAINERS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,985 1,356,975 kWh $0.08
TOTAL ENERGY COSTS $110,985
RECOMMENDED SAVINGS* $11,784 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,784
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,552
Cost:
-
$1,552 19,050 $1,552
19,050
kWh
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$554
Cost:
$42
$554 6,741 $554
6,741
kWh
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,753
Cost:
$800
$1,753 21,395 $1,753
21,395
kWh
04: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$2,320
Cost:
-
$2,320 28,429 $2,320
28,429
kWh
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$630
Cost:
$169
$630 7,620 $630
7,620
kWh
06: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$4,975
Cost:
$6,700
$4,975 60,668 $4,975
60,668
kWh
TOTAL RECOMMENDED Savings:
$11,784
Cost:
$7,711
$11,784 143,903 $11,784
143,903
kWh
TOTAL IMPLEMENTED Savings:
$11,784
Cost:
$7,711
$11,784 143,903 $11,784
143,903
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage