IAC logo
IAC Assessment: RU0136
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0136
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product PLASTIC BAGS
NAICS n/a
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 15,000,000 Pounds
Production Hrs. Annual 6,600
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $352,420 4,271,981 kWh $0.08
Natural Gas $411,061 80,732 MMBtu $5.09
TOTAL ENERGY COSTS $763,481
RECOMMENDED SAVINGS* $18,352 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,543
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,772
Cost:
-
$4,772 57,737 - - - - $4,772
57,737
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,508
Cost:
$8,097
$7,708 93,494 - - $(-1,200) - $7,708
93,494
kWh
-
-
MMBtu
$(-1,200)
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$498
Cost:
$152
$498 6,155 - - - - $498
6,155
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,771
Cost:
$30
$3,771 42,790 - - - - $3,771
42,790
kWh
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,803
Cost:
$500
- - $2,803 567 - - -
-
kWh
$2,803
567
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$18,352
Cost:
$8,779
$16,749 200,176 $2,803 567 $(-1,200) - $16,749
200,176
kWh
$2,803
567
MMBtu
$(-1,200)
-
$
TOTAL IMPLEMENTED Savings:
$8,543
Cost:
$30
$8,543 100,527 - - - - $8,543
100,527
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes