IAC logo
IAC Assessment: RU0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product RUBBER, PLASTIC, METAL
NAICS n/a
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 188
Plant Area (Sq.Ft.) 0
Annual Production 10,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,606 1,163,834 kWh $0.11
Fuel Oil #2 $124,966 24,562 MMBtu $5.09
TOTAL ENERGY COSTS $257,572
RECOMMENDED SAVINGS* $14,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,314
Cost:
$201
$1,718 14,947 - - $(-404) - $1,718
14,947
kWh
-
-
MMBtu
$(-404)
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$912
Cost:
-
$912 7,913 - - - - $912
7,913
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$471
Cost:
$272
$471 4,103 - - - - $471
4,103
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,885
Cost:
$500
- - $10,885 2,140 - - -
-
kWh
$10,885
2,140
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$892
Cost:
$30
$892 7,913 - - - - $892
7,913
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,474
Cost:
$1,003
$3,993 34,876 $10,885 2,140 $(-404) - $3,993
34,876
kWh
$10,885
2,140
MMBtu
$(-404)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes