Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Rutgers, State Univ. of NJ |
---|---|
Assessment Year | 1992 |
Principal Product | HOME FURNACES |
NAICS | n/a |
SIC | 3433 - Heating Equipment, Except Electric |
Sales | $5,000,000-$10,000,000 |
# of Employees | 57 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,040 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $65,853 | 746,190 | kWh | $0.09 |
Fuel Oil #2 | $10,601 | 1,448 | MMBtu | $7.32 |
Coal | $24,257 | 8,232 | MMBtu | $2.95 |
TOTAL ENERGY COSTS | $100,711 | |||
RECOMMENDED SAVINGS* | $6,139 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,135 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Coal | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Coal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,086 Cost: $3,500 |
$1,086 | 12,309 | - | - | - | - | - | - | - | - |
$1,086 12,309 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $421 Cost: $3,470 |
$522 | 4,982 | - | - | - | - | - | - | $(-101) | - |
$522 4,982 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
$(-101) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $500 Cost: $571 |
$500 | 5,569 | - | - | - | - | - | - | - | - |
$500 5,569 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,450 Cost: $500 |
- | - | - | - | $212 | 29 | $1,238 | 420 | - | - |
- - kWh |
- - MMBtu |
$212 29 MMBtu |
$1,238 420 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,099 Cost: - |
$2,099 | 23,740 | - | - | - | - | - | - | - | - |
$2,099 23,740 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $583 Cost: $500 |
- | - | $583 | 83 | - | - | - | - | - | - |
- - kWh |
$583 83 MMBtu |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $6,139 Cost: $8,541 |
$4,207 | 46,600 | $583 | 83 | $212 | 29 | $1,238 | 420 | $(-101) | - | $4,207 46,600 kWh |
$583 83 MMBtu |
$212 29 MMBtu |
$1,238 420 MMBtu |
$(-101) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,135 Cost: $4,571 |
$3,685 | 41,618 | - | - | $212 | 29 | $1,238 | 420 | - | - | $3,685 41,618 kWh |
- - MMBtu |
$212 29 MMBtu |
$1,238 420 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Coal | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Coal | Administrative Changes |