IAC logo
IAC Assessment: RU0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product NON-OFFICE STAPLERS
NAICS n/a
SIC 3496 - Misc. Fabricated Wire Products
Sales $50,000,000-$100,000,000
# of Employees 480
Plant Area (Sq.Ft.) 0
Annual Production 30,800,000 Pieces
Production Hrs. Annual 5,760
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,681 2,837,046 kWh $0.10
Natural Gas $147,199 28,610 MMBtu $5.15
TOTAL ENERGY COSTS $427,880
RECOMMENDED SAVINGS* $29,503 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,503
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,237
Cost:
$12,750
$4,237 42,790 - - - - $4,237
42,790
kWh
-
-
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$707
Cost:
$322
- - $707 137 - - -
-
kWh
$707
137
MMBtu
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$1,112
Cost:
$350
- - $1,112 216 - - -
-
kWh
$1,112
216
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,501
Cost:
$849
$3,501 35,463 - - - - $3,501
35,463
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$678
Cost:
-
$678 6,741 - - - - $678
6,741
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,367
Cost:
$507
$9,874 99,941 - - $(-507) - $9,874
99,941
kWh
-
-
MMBtu
$(-507)
-
$
07: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$9,901
Cost:
$11,500
- - $9,901 1,923 - - -
-
kWh
$9,901
1,923
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$29,503
Cost:
$26,278
$18,290 184,935 $11,720 2,276 $(-507) - $18,290
184,935
kWh
$11,720
2,276
MMBtu
$(-507)
-
$
TOTAL IMPLEMENTED Savings:
$29,503
Cost:
$26,278
$18,290 184,935 $11,720 2,276 $(-507) - $18,290
184,935
kWh
$11,720
2,276
MMBtu
$(-507)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes