IAC logo
IAC Assessment: RU0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: RU0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Rutgers, State Univ. of NJ
Assessment Year 1992
Principal Product FLEXOGRAPHIC PRINTING
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $5,000,000-$10,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 1,225,000 Pounds
Production Hrs. Annual 2,080
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,630 577,081 kWh $0.11
Natural Gas $14,911 2,573 MMBtu $5.80
TOTAL ENERGY COSTS $77,541
RECOMMENDED SAVINGS* $6,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,535
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$955
Cost:
-
$955 8,499 - - $955
8,499
kWh
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,016
Cost:
$522
$1,016 9,379 - - $1,016
9,379
kWh
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,283
Cost:
-
$2,283 21,102 - - $2,283
21,102
kWh
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$44
Cost:
$500
$44 293 - - $44
293
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$106
Cost:
$44
$150 1,465 $(-44) - $150
1,465
kWh
$(-44)
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,580
Cost:
$2,500
$2,580 - - - $2,580
-
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$6,984
Cost:
$3,566
$7,028 40,738 $(-44) - $7,028
40,738
kWh
$(-44)
-
$
TOTAL IMPLEMENTED Savings:
$3,535
Cost:
$2,500
$3,535 8,499 - - $3,535
8,499
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes