IAC logo
IAC Assessment: SD0029
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0029
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1992
Principal Product CRT FRAMES FOR TVs
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 79
Plant Area (Sq.Ft.) 0
Annual Production 700,000 Pieces
Production Hrs. Annual 6,375
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $263,132 3,109,613 kWh $0.08
Natural Gas $4,449 635 MMBtu $7.01
TOTAL ENERGY COSTS $267,581
RECOMMENDED SAVINGS* $14,952 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,554
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$239
Cost:
$173
$239 2,931 - - - - $239
2,931
kWh
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$436
Cost:
$73
$436 5,275 - - - - $436
5,275
kWh
-
-
MMBtu
-
-
$
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$4,064
Cost:
$638
$4,064 48,066 - - - - $4,064
48,066
kWh
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,879
Cost:
$3,000
$12,184 143,904 $(-4,305) (-614) - - $12,184
143,904
kWh
$(-4,305)
(-614)
MMBtu
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,036
Cost:
$560
$894 10,551 - - $142 - $894
10,551
kWh
-
-
MMBtu
$142
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,298
Cost:
$800
$1,160 13,775 - - $138 - $1,160
13,775
kWh
-
-
MMBtu
$138
-
$
TOTAL RECOMMENDED Savings:
$14,952
Cost:
$5,244
$18,977 224,502 $(-4,305) (-614) $280 - $18,977
224,502
kWh
$(-4,305)
(-614)
MMBtu
$280
-
$
TOTAL IMPLEMENTED Savings:
$8,554
Cost:
$3,246
$12,859 152,110 $(-4,305) (-614) - - $12,859
152,110
kWh
$(-4,305)
(-614)
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes