Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1994
Principal Product Ceramic Packages
NAICS n/a
SIC 3678 - Electronic Connectors
Sales $50,000,000-$100,000,000
# of Employees 495
Plant Area (Sq.Ft.) 70,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,190,049 17,260,551 kWh $0.07
Natural Gas $257,932 53,295 MMBtu $4.84
TOTAL ENERGY COSTS $1,447,981
RECOMMENDED SAVINGS* $138,747 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,306
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,306
Cost:
$7,840
$5,306 77,081 $5,306
77,081
kWh
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$28,013
Cost:
$50,500
$28,013 406,213 $28,013
406,213
kWh
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$47,221
Cost:
$10,000
$47,221 285,756 $47,221
285,756
kWh
04: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$58,207
Cost:
$132,600
$58,207 - $58,207
-
kWh
TOTAL RECOMMENDED Savings:
$138,747
Cost:
$200,940
$138,747 769,050 $138,747
769,050
kWh
TOTAL IMPLEMENTED Savings:
$5,306
Cost:
$7,840
$5,306 77,081 $5,306
77,081
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage