Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1996 |
Principal Product | Plated Metals and Plastic Products |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 163,651 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 3,960 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $725,987 | 11,097,304 | kWh | $0.07 |
Electricity Demand | $211,349 | 30,274 | kW-months/year | $6.98 |
Natural Gas | $247,501 | 72,012 | MMBtu | $3.44 |
TOTAL ENERGY COSTS | $1,227,193 | |||
RECOMMENDED SAVINGS* | $82,518 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,150 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $18,102 Cost: $21,570 |
$18,102 | 199,590 | - | - | - | - | - | - |
$18,102 199,590 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,242 Cost: $3,920 |
$2,242 | 31,653 | - | - | - | - | - | - |
$2,242 31,653 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT |
Savings: $10,042 Cost: $4,160 |
- | - | $10,042 | 2,953 | - | - | - | - |
- - kWh |
$10,042 2,953 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,408 Cost: $3,077 |
- | - | $2,408 | 708 | - | - | - | - |
- - kWh |
$2,408 708 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,368 Cost: $5,825 |
$7,368 | 75,615 | - | - | - | - | - | - |
$7,368 75,615 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $7,565 Cost: $3,410 |
- | - | - | - | $7,565 | - | - | - |
- - kWh |
- - MMBtu |
$7,565 - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6114 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE |
Savings: $34,791 Cost: $5,000 |
- | - | - | - | - | - | $34,791 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$34,791 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,518 Cost: $46,962 |
$27,712 | 306,858 | $12,450 | 3,661 | $7,565 | - | $34,791 | - | $27,712 306,858 kWh |
$12,450 3,661 MMBtu |
$7,565 - Tgal |
$34,791 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,150 Cost: $41,137 |
$20,344 | 231,243 | $12,450 | 3,661 | $7,565 | - | $34,791 | - | $20,344 231,243 kWh |
$12,450 3,661 MMBtu |
$7,565 - Tgal |
$34,791 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (haz) |