Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1996 |
Principal Product | Medical Instruments and Fiberglass Arm Casts |
NAICS | n/a |
SIC | 3847 - |
Sales | $50,000,000-$100,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 72,000 |
Annual Production | 17,000,000 Pieces |
Production Hrs. Annual | 6,125 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $209,411 | 2,993,259 | kWh | $0.07 |
Electricity Demand | $70,198 | 6,908 | kW-months/year | $10.16 |
Electricity Fees | $279,609 | - | $ | - |
Natural Gas | $61,287 | 9,938 | MMBtu | $6.17 |
TOTAL ENERGY COSTS | $620,505 | |||
RECOMMENDED SAVINGS* | $38,812 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,812 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,178 Cost: $1,360 |
$2,178 | 25,205 | - | - | - | - | - | - | - | - |
$2,178 25,205 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,982 Cost: $400 |
- | - | $8,982 | 347 | - | - | - | - | - | - |
- - kWh |
$8,982 347 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $7,082 Cost: $8,500 |
- | - | $7,082 | 262 | - | - | - | - | - | - |
- - kWh |
$7,082 262 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,750 Cost: $40 |
- | - | $1,750 | 85 | - | - | - | - | - | - |
- - kWh |
$1,750 85 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,032 Cost: $1,127 |
- | - | - | - | $3,032 | 705 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,032 705 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,485 Cost: $1,127 |
- | - | - | - | $2,485 | 578 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,485 578 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $1,053 Cost: $1,127 |
- | - | - | - | $1,053 | 245 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,053 245 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE |
Savings: $9,000 Cost: $6,000 |
- | - | - | - | - | - | $9,000 | 13,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$9,000 13,000 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $3,250 Cost: $4,000 |
- | - | - | - | - | - | - | - | $3,250 | 6,500 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$3,250 6,500 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,812 Cost: $23,681 |
$2,178 | 25,205 | $17,814 | 694 | $6,570 | 1,528 | $9,000 | 13,000 | $3,250 | 6,500 | $2,178 25,205 kWh |
$17,814 694 kW-months/year |
$6,570 1,528 MMBtu |
$9,000 13,000 gal |
$3,250 6,500 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,812 Cost: $23,681 |
$2,178 | 25,205 | $17,814 | 694 | $6,570 | 1,528 | $9,000 | 13,000 | $3,250 | 6,500 | $2,178 25,205 kWh |
$17,814 694 kW-months/year |
$6,570 1,528 MMBtu |
$9,000 13,000 gal |
$3,250 6,500 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (haz) |