IAC logo
IAC Assessment: SD0156
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1996
Principal Product Memory and output device chips
NAICS n/a
SIC 3083 - Laminated Plastics Plate & Sheet
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 33,840
Annual Production 10,000,000 Units
Production Hrs. Annual 8,568
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $892,297 13,776,964 kWh $0.06
Electricity Demand $281,127 32,645 kW-months/year $8.61
TOTAL ENERGY COSTS $1,173,424
RECOMMENDED SAVINGS* $40,644 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,644
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.2514 COVER OPEN TANKS Savings:
$3,289
Cost:
$521
$3,289 51,290 - - $3,289
51,290
kWh
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,632
Cost:
$651
$3,632 56,858 - - $3,632
56,858
kWh
-
-
$
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$1,278
Cost:
$100
$1,278 19,930 - - $1,278
19,930
kWh
-
-
$
04: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$2,794
Cost:
$875
$2,794 43,669 - - $2,794
43,669
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,515
Cost:
$22,017
$10,515 116,061 - - $10,515
116,061
kWh
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$13,620
Cost:
$12,370
$13,620 148,300 - - $13,620
148,300
kWh
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,356
Cost:
$3,822
$4,356 43,669 - - $4,356
43,669
kWh
-
-
$
08: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$360
Cost:
$400
- - $360 - -
-
kWh
$360
-
$
09: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$800
Cost:
$418
- - $800 - -
-
kWh
$800
-
$
TOTAL RECOMMENDED Savings:
$40,644
Cost:
$41,174
$39,484 479,777 $1,160 - $39,484
479,777
kWh
$1,160
-
$
TOTAL IMPLEMENTED Savings:
$40,644
Cost:
$41,174
$39,484 479,777 $1,160 - $39,484
479,777
kWh
$1,160
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes