IAC logo
IAC Assessment: SD0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1997
Principal Product Transformers, inductors and electric components for major in
NAICS n/a
SIC 3677 - Electronic Coils And Transformers
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 27,000
Annual Production 3,200 Pieces
Production Hrs. Annual 2,167
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,407 1,009,672 kWh $0.08
Electricity Demand $28,948 3,566 kW-months/year $8.12
Natural Gas $1,991 263 MMBtu $7.57
TOTAL ENERGY COSTS $113,346
RECOMMENDED SAVINGS* $34,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,349
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$721
Cost:
$1,200
$558 6,741 $163 20 - - - - $558
6,741
kWh
$163
20
kW-months/year
-
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,934
Cost:
$17,722
$6,327 77,081 $2,607 321 - - - - $6,327
77,081
kWh
$2,607
321
kW-months/year
-
-
gal
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$15,429
Cost:
$16,085
$10,936 133,353 $4,493 553 - - - - $10,936
133,353
kWh
$4,493
553
kW-months/year
-
-
gal
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,120
Cost:
$2,000
- - - - - - $3,120 - -
-
kWh
-
-
kW-months/year
-
-
gal
$3,120
-
$
05: 3.8224 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS Savings:
$4,145
Cost:
-
- - - - $4,145 550 - - -
-
kWh
-
-
kW-months/year
$4,145
550
gal
-
-
$
06: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$2,397
Cost:
$320
- - - - - - $2,397 - -
-
kWh
-
-
kW-months/year
-
-
gal
$2,397
-
$
TOTAL RECOMMENDED Savings:
$34,746
Cost:
$37,327
$17,821 217,175 $7,263 894 $4,145 550 $5,517 - $17,821
217,175
kWh
$7,263
894
kW-months/year
$4,145
550
gal
$5,517
-
$
TOTAL IMPLEMENTED Savings:
$32,349
Cost:
$37,007
$17,821 217,175 $7,263 894 $4,145 550 $3,120 - $17,821
217,175
kWh
$7,263
894
kW-months/year
$4,145
550
gal
$3,120
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes