Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1997 |
Principal Product | Painting and decorating plastic injected molds parts |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 1,500,000 Pieces |
Production Hrs. Annual | 4,312 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $84,280 | 1,145,076 | kWh | $0.07 |
Electricity Demand | $24,623 | 3,112 | kW-months/year | $7.91 |
Natural Gas | $45,648 | 8,529 | MMBtu | $5.35 |
TOTAL ENERGY COSTS | $154,551 | |||
RECOMMENDED SAVINGS* | $647,438 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $60,660 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1224 REPLACE BOILER |
Savings: $8,920 Cost: $15,000 |
- | - | - | - | $8,920 | 1,652 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,920 1,652 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,564 Cost: $350 |
$1,217 | 16,413 | $347 | 44 | - | - | - | - | - | - | - | - |
$1,217 16,413 kWh |
$347 44 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,715 Cost: $11,208 |
$8,319 | 112,544 | $2,396 | 303 | - | - | - | - | - | - | - | - |
$8,319 112,544 kWh |
$2,396 303 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $4,501 Cost: $3,940 |
$3,381 | 45,721 | $1,120 | 142 | - | - | - | - | - | - | - | - |
$3,381 45,721 kWh |
$1,120 142 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $6,200 Cost: $9,000 |
- | - | - | - | - | - | - | - | - | - | $6,200 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$6,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $2,550 Cost: - |
- | - | - | - | - | - | - | - | - | - | $2,550 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$2,550 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8224 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS |
Savings: $10,940 Cost: - |
- | - | - | - | - | - | $10,940 | 2,230 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,940 2,230 gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7134 WASH AND REUSE RAGS ON-SITE |
Savings: $11,710 Cost: $1,000 |
- | - | - | - | - | - | - | - | $11,710 | 5,600 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$11,710 5,600 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $14,500 Cost: $5,000 |
- | - | - | - | - | - | - | - | - | - | $14,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$14,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.421 MODIFY CURRENT INCENTIVE PROGRAM |
Savings: $575,838 Cost: $120,000 |
- | - | - | - | - | - | - | - | - | - | $575,838 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$575,838 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $647,438 Cost: $165,498 |
$12,917 | 174,678 | $3,863 | 489 | $8,920 | 1,652 | $10,940 | 2,230 | $11,710 | 5,600 | $599,088 | - | $12,917 174,678 kWh |
$3,863 489 kW-months/year |
$8,920 1,652 MMBtu |
$10,940 2,230 gal |
$11,710 5,600 lb |
$599,088 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $60,660 Cost: $45,498 |
$12,917 | 174,678 | $3,863 | 489 | $8,920 | 1,652 | - | - | $11,710 | 5,600 | $23,250 | - | $12,917 174,678 kWh |
$3,863 489 kW-months/year |
$8,920 1,652 MMBtu |
- - gal |
$11,710 5,600 lb |
$23,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |