Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1998 |
Principal Product | Metallic and Non-Metallic Ducting |
NAICS | n/a |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $50,000,000-$100,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 240,000 Pieces |
Production Hrs. Annual | 4,890 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $234,077 | 4,300,997 | kWh | $0.05 |
Electricity Demand | $186,069 | 18,212 | kW-months/year | $10.22 |
Natural Gas | $55,736 | 10,093 | MMBtu | $5.52 |
TOTAL ENERGY COSTS | $475,882 | |||
RECOMMENDED SAVINGS* | $151,891 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,042 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,838 Cost: $5,890 |
$3,277 | 60,668 | $1,561 | 118 | - | - | - | - | - | - | - | - | - | - |
$3,277 60,668 kWh |
$1,561 118 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $45,498 Cost: $34,650 |
$32,621 | 604,338 | $12,877 | 1,260 | - | - | - | - | - | - | - | - | - | - |
$32,621 604,338 kWh |
$12,877 1,260 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,897 Cost: $1,800 |
$7,862 | 145,369 | $3,035 | 297 | - | - | - | - | - | - | - | - | - | - |
$7,862 145,369 kWh |
$3,035 297 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,084 Cost: $41,850 |
$6,461 | 119,578 | $3,623 | 354 | - | - | - | - | - | - | - | - | - | - |
$6,461 119,578 kWh |
$3,623 354 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $3,919 Cost: $5,418 |
- | - | - | - | $3,919 | 713 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,919 713 MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $18,900 Cost: $8,500 |
- | - | - | - | - | - | - | - | - | - | - | - | $18,900 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
$18,900 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.8224 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS |
Savings: $15,696 Cost: $1,450 |
- | - | - | - | - | - | - | - | $15,696 | 16,297 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$15,696 16,297 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $12,650 Cost: - |
- | - | - | - | - | - | - | - | - | - | $12,650 | 56,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
$12,650 56,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $654 Cost: $750 |
- | - | - | - | - | - | $654 | 355,430 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$654 355,430 gal |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $28,755 Cost: $200,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $28,755 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
$28,755 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $151,891 Cost: $300,308 |
$50,221 | 929,953 | $21,096 | 2,029 | $3,919 | 713 | $654 | 355,430 | $15,696 | 16,297 | $12,650 | 56,000 | $47,655 | - | $50,221 929,953 kWh |
$21,096 2,029 kW-months/year |
$3,919 713 MMBtu |
$654 355,430 gal |
$15,696 16,297 gal |
$12,650 56,000 lb |
$47,655 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,042 Cost: $15,140 |
$3,277 | 60,668 | $1,561 | 118 | - | - | $654 | 355,430 | - | - | $12,650 | 56,000 | $18,900 | - | $3,277 60,668 kWh |
$1,561 118 kW-months/year |
- - MMBtu |
$654 355,430 gal |
- - gal |
$12,650 56,000 lb |
$18,900 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |