Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1998 |
Principal Product | Prefabricated Buildings |
NAICS | n/a |
SIC | 3448 - Prefabricated Metal Buildings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 2,800 |
Annual Production | 2,000 Pieces |
Production Hrs. Annual | 4,208 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $69,359 | 906,800 | kWh | $0.08 |
Electricity Demand | $25,601 | 3,121 | kW-months/year | $8.20 |
TOTAL ENERGY COSTS | $94,960 | |||
RECOMMENDED SAVINGS* | $80,057 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $44,008 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Other Liquid (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,498 Cost: $1,550 |
$7,285 | 94,666 | $2,213 | 270 | - | - | - | - |
$7,285 94,666 kWh |
$2,213 270 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,473 Cost: $600 |
$1,473 | 19,050 | - | - | - | - | - | - |
$1,473 19,050 kWh |
- - kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $491 Cost: $221 |
$491 | 6,448 | - | - | - | - | - | - |
$491 6,448 kWh |
- - kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,631 Cost: $13,030 |
$13,584 | 176,436 | $4,047 | 494 | - | - | - | - |
$13,584 176,436 kWh |
$4,047 494 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $2,099 Cost: $1,980 |
$1,443 | 18,757 | $656 | 80 | - | - | - | - |
$1,443 18,757 kWh |
$656 80 kW-months/year |
- - gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,880 Cost: $5,000 |
- | - | - | - | - | - | $2,880 | - |
- - kWh |
- - kW-months/year |
- - gal |
$2,880 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $11,900 Cost: $60 |
- | - | - | - | $11,900 | 480 | - | - |
- - kWh |
- - kW-months/year |
$11,900 480 gal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL |
Savings: $15,149 Cost: $5,000 |
- | - | - | - | - | - | $15,149 | - |
- - kWh |
- - kW-months/year |
- - gal |
$15,149 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $15,149 Cost: - |
- | - | - | - | - | - | $15,149 | - |
- - kWh |
- - kW-months/year |
- - gal |
$15,149 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.421 MODIFY CURRENT INCENTIVE PROGRAM |
Savings: $3,787 Cost: - |
- | - | - | - | - | - | $3,787 | - |
- - kWh |
- - kW-months/year |
- - gal |
$3,787 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $80,057 Cost: $27,441 |
$24,276 | 315,357 | $6,916 | 844 | $11,900 | 480 | $36,965 | - | $24,276 315,357 kWh |
$6,916 844 kW-months/year |
$11,900 480 gal |
$36,965 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $44,008 Cost: $21,620 |
$22,312 | 289,859 | $6,916 | 844 | $11,900 | 480 | $2,880 | - | $22,312 289,859 kWh |
$6,916 844 kW-months/year |
$11,900 480 gal |
$2,880 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Other Liquid (haz) | Administrative Changes |