Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1998 |
Principal Product | Fiberglass Motor Home Parts |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 81 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 30,000 Pieces |
Production Hrs. Annual | 2,500 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $98,382 | 1,215,709 | kWh | $0.08 |
Electricity Demand | $42,438 | 5,004 | kW-months/year | $8.48 |
Natural Gas | $13,463 | 2,151 | MMBtu | $6.26 |
TOTAL ENERGY COSTS | $154,283 | |||
RECOMMENDED SAVINGS* | $376,689 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,856 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,633 Cost: $14,800 |
$2,924 | 35,756 | $1,709 | 201 | - | - | - | - | - | - | - | - |
$2,924 35,756 kWh |
$1,709 201 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,315 Cost: $950 |
$2,712 | 33,411 | $1,603 | 189 | - | - | - | - | - | - | - | - |
$2,712 33,411 kWh |
$1,603 189 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $2,717 Cost: $5,000 |
$1,759 | 21,688 | $958 | 113 | - | - | - | - | - | - | - | - |
$1,759 21,688 kWh |
$958 113 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $993 Cost: $900 |
$993 | 12,309 | - | - | - | - | - | - | - | - | - | - |
$993 12,309 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,311 Cost: - |
$811 | 9,965 | $500 | 57 | - | - | - | - | - | - | - | - |
$811 9,965 kWh |
$500 57 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $1,157 Cost: $1,125 |
- | - | - | - | $1,157 | 184 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,157 184 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $844 Cost: $2,865 |
- | - | - | - | $844 | 134 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$844 134 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,268 Cost: $9,327 |
$2,181 | 26,671 | $1,087 | 123 | - | - | - | - | - | - | - | - |
$2,181 26,671 kWh |
$1,087 123 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $2,966 Cost: $3,120 |
$2,020 | 24,912 | $946 | 94 | - | - | - | - | - | - | - | - |
$2,020 24,912 kWh |
$946 94 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $338,670 Cost: $24,000 |
- | - | - | - | - | - | - | - | $338,670 | 426,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$338,670 426,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $3,800 Cost: $1,200 |
- | - | - | - | - | - | $3,800 | 19 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,800 19 gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.7131 USE A RAG RECYCLE SERVICE |
Savings: $8,640 Cost: $200 |
- | - | - | - | - | - | - | - | $8,640 | 12,240 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$8,640 12,240 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,375 Cost: $4,864 |
- | - | - | - | - | - | - | - | - | - | $3,375 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$3,375 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $376,689 Cost: $68,351 |
$13,400 | 164,712 | $6,803 | 777 | $2,001 | 318 | $3,800 | 19 | $347,310 | 438,240 | $3,375 | - | $13,400 164,712 kWh |
$6,803 777 kW-months/year |
$2,001 318 MMBtu |
$3,800 19 gal |
$347,310 438,240 lb |
$3,375 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,856 Cost: $25,277 |
$7,817 | 95,838 | $4,399 | 513 | - | - | - | - | $8,640 | 12,240 | - | - | $7,817 95,838 kWh |
$4,399 513 kW-months/year |
- - MMBtu |
- - gal |
$8,640 12,240 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |