IAC logo
IAC Assessment: SD0196
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0196
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Formed & Molded Plastic Products
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 104,000
Annual Production 300,000 Pieces
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,718 2,000,879 kWh $0.07
Electricity Demand $68,870 7,756 kW-months/year $8.88
Natural Gas $86,572 15,715 MMBtu $5.51
TOTAL ENERGY COSTS $290,160
RECOMMENDED SAVINGS* $116,521 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,827
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$47,330
Cost:
$12,960
$34,853 520,223 $13,808 1,555 $(-1,331) (-242) - - $34,853
520,223
kWh
$13,808
1,555
kW-months/year
$(-1,331)
(-242)
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,292
Cost:
$1,500
$3,074 46,014 $1,218 137 - - - - $3,074
46,014
kWh
$1,218
137
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$3,308
Cost:
$1,151
$2,369 35,463 $939 106 - - - - $2,369
35,463
kWh
$939
106
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,255
Cost:
-
$1,661 24,912 $594 67 - - - - $1,661
24,912
kWh
$594
67
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,717
Cost:
$5,000
$1,759 21,688 $958 113 - - - - $1,759
21,688
kWh
$958
113
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,432
Cost:
$1,305
$1,099 16,413 $333 38 - - - - $1,099
16,413
kWh
$333
38
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$522
Cost:
$600
$522 6,448 - - - - - - $522
6,448
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$7,420
Cost:
$1,213
- - - - $7,420 742 - - -
-
kWh
-
-
kW-months/year
$7,420
742
MMBtu
-
-
$
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,836
Cost:
$1,125
- - - - $1,836 184 - - -
-
kWh
-
-
kW-months/year
$1,836
184
MMBtu
-
-
$
10: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$1,339
Cost:
$2,865
- - - - $1,339 134 - - -
-
kWh
-
-
kW-months/year
$1,339
134
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,972
Cost:
$7,130
$2,049 30,481 $923 104 - - - - $2,049
30,481
kWh
$923
104
kW-months/year
-
-
MMBtu
-
-
$
12: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,025
Cost:
$2,790
$2,022 30,188 $1,003 113 - - - - $2,022
30,188
kWh
$1,003
113
kW-months/year
-
-
MMBtu
-
-
$
13: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,500
Cost:
$8,500
- - - - - - $3,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,500
-
$
14: 3.7134 WASH AND REUSE RAGS ON-SITE Savings:
$1,598
Cost:
$810
- - - - - - $1,598 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,598
-
$
15: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$17,000
Cost:
$3,500
- - - - - - $17,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,000
-
$
16: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$11,475
Cost:
$14,000
- - - - - - $11,475 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,475
-
$
17: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$4,500
Cost:
$1,000
- - - - - - $4,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,500
-
$
TOTAL RECOMMENDED Savings:
$116,521
Cost:
$65,449
$49,408 731,830 $19,776 2,233 $9,264 818 $38,073 - $49,408
731,830
kWh
$19,776
2,233
kW-months/year
$9,264
818
MMBtu
$38,073
-
$
TOTAL IMPLEMENTED Savings:
$20,827
Cost:
$19,281
$9,153 136,870 $3,674 414 - - $8,000 - $9,153
136,870
kWh
$3,674
414
kW-months/year
-
-
MMBtu
$8,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes